Menu
Green Energy

Planning Application

FCC Environment submitted the planning application and associated Environmental Impact Assessment to Midlothian Council on the 31st March 2015.

A copy of the application and associated documents can be found below.

The consultation process for the application ended with additional Environmental Information being submitted by FCC as part of a Regulation 23 submission dated 29th June 2015. This submission was made following the responses received on the initial application consultation process. Details submitted under this Reg 23 submission can be found on the Council website as linked below.

The planning application is currently awaiting final determination and the application and associated consultation responses can be found on the Midlothian Councils website by clicking here.

FCC Environment will continue to provide updates to the planning application through the determination period.


Planning Application Document (PAD)

Part 1 Planning Application Forms, Certificates and Notices

Planning Application Forms

Land Ownership Certificates and Notices

Part 2 - Design and Access Statement

Design and Access Statement

Part 3 - Planning Statement

Planning Statement Final

Appendices

Appendix 1 - 1 PPiP Permission

Figures

Figure 1 - 1 Site Location 1 - 25,000

Figure1 - 2 Approved Shawfair Masterplan

Figure 2 - 1 Zero Waste Parc Layout

Figure 2 - 2 Baseline Developments

Figure 2 - 3 Surrounding Development Proposals

Part 4 - Planning Application Drawings

1309 PL100 Red Line Location Plan

1309 PL101 Exsisting Site Levels

1309 PL102 Proposed Site Levels

1309 PL110 Site Layout

1309 PL120 RERC Floor Plan -8.00m

1309 PL121 RERC Floor Plan +0.00m

1309 PL122 RERC Floor Plan +7.00m

1309 PL123 RERC Floor Plan +11.00m and 15.50m

1309 PL124 RERC Floor Plan +21.00m

1309 PL125 RERC Roof Plan

1309 PL130 Bale Storage Floor and roof plan

1309 PL201 Existing site sections A-A and B-B

1309 PL202 Proposed site sections A-A and B-B

1309 PL301 RERC South Elevations

1309 PL302 RERC West Elevations

1309 PL303 RERC North Elevations

1309 PL304 RERC East Elevations

1309 PL305 RERC Section C-C (Part elevation)

1309 PL306 RERC Section D-D (part elevation)

1309 PL310 Visitor Centre and Staff Accommodation Elevations and Plans

1309 PL311 Gatehouse Elevations and Plans

1309 PL312 Crew Welfare Elevations and Plans

1309 PL313 Bale Storage Elevations

1309 PL314 AAC Elevations

1309 PL315 Transformer and Emergency Generator Elevations

1309 PL316 33KV substation and Pump house Elevations

1309 PL317 Rainwater Tanks and Electrical Cabinet Elevations

1309 PL318 Ammonia Store Elevations

1309 PL319 Cycle Store, Bin Store and smoking shelter Elevations and Plans

1309 PL320 Fuel Oil Tank Elevations

1488 01 01 Indicative Landscape Masterplan

1488 01 02 Fencing & Gating Plan

T 15 1580 CL(19)01 P4 Schematic Drainage Layout

Part 5 - Pre-Application Consultation Report

Pre-Application Consultation Report

Part 6 - Heat and Power Plan

Heat and Power Plant Report

Annex 1 - Schematic Process Flow Diagram

Annex 2 - Electricity Connection Route

Annex 3 - Typical Schematic CHP Arrangement

Annex 4 - Heat Connection Route

Annex 5 - Indentification of Primary Heat Off-take Site Developments

Annex 6 - Letters of Support

Part 7 - Tree Survey

Tree Survey

Environmental Statement (ES)

ES Vol 1 Main Report

Vol 1 - Main Report Final

Figures

Figure 1 - 1 Site Location 1 - 25,000

Figure 1 - 2 Approved Shawfair Masterplan

Figure 2 - 1 Zero Waste Parc Layout

Figure 2 - 2 Baseline Developments

Figure 2 - 3 Surrounding Development Proposals

Figure 2 - 4 PPiP and RERC Development

Figure 4 - 1 Site Layout

Figure 4 - 2 Roof Plan

Figure 4 - 3 Existing Site Sections

Figure 4 - 4 Proposed Site Sections

Figure 4 - 5 South Elevation

Figure 4 - 6 West Elevation

Figure 4 - 7 North Elevation

Figure 4 - 8 East Elevation

Figure 4 - 9 Section C-C

Figure 4 - 10 Section D-D

Figure 4 - 11 Visitor Centre and Staff Accomodation

Figure 4 - 12 Gatehouse Elevations and Plans

Figure 4 - 13 Crew Welfare Elevations and Plans

Figure 4 - 14 Bale Storage Elevations

Figure 4 - 15 Cycle Store, Bin Store and Smoking Shelter

Figure 4 - 16 Fencing and Gating Plan

Figure 4 - 17 Schematic Flow Diagram

Figure 7 - 1a Landscape Character 5km

Figure 7 - 1b Landscape Character 2.5km

Figure 7 - 2 Zone of Theoretical Visibility

Figure 7 - 3a Viewpoints Sheet 1

Figure 7 - 3b Viewpoints Sheet 2

Figure 7 - 3c Viewpoints Sheet 3

Figure 7 - 3d Viewpoints Sheet 4

Figure 7 - 3e Viewpoints Sheet 5

Figure 7 - 3f Viewpoints Sheet 6

Figure 7 - 3g Viewpoints Sheet 7

Figure 7 - 3h Viewpoints Sheet 8

Figure 7 - 3i Viewpoints Sheet 9

Figure 7 - 3j Viewpoints Sheet 10

Figure 7 - 3k Viewpoints Sheet 11

Figure 7 - 3l Viewpoints Sheet 12

Figure 7 - 3m Viewpoints Sheet 13

Figure 7 - 4 Rev A Indicative Landscape Masterplan

Figure 8 - 1 Statutory Designated Sites and Ancient Woodlands

Figure 10 - 1 Schematic Drainage Layout

Figure 11 - 1 Baseline Noise Monitoring

Figure 13 - 1 Heritage Assets within 2km of the Proposed Development

Figure 13 - 2 Heritage Assets Within 5km of the Proposed Development

Figure 14 - 1 Midlothian Wards 1999 to 2007

Figure 14 - 2 Midlothian Wards 2007 Onwards

Figure 15 - 1 5km Buffer

Figure 16 - 1 Heat Connection Route

Figure 16 - 2 Electricity Connection Route

ES Vol 2 Technical Appendicies

ES Vol 2 Technical Appendicies Final

Appendix 1 - 1 PPIP Permission

Appendix 2 - 1 EIA Scoping Report

Appendix 2 - 2 Historic Scotland Consultation Response

Appendix 2 - 3 Minutes of Meetings

Appendix 7 - 1 LVIA Methodology

Appendix 7 - 2 Viewpoint Selection

Appendix 7 - 3 Effects on Landscape Character

Appendix 7 - 4 Effects on Viewpoints

Appendix 8 - 1 Extended Phase 1 Habitat Survey

Appendix 10 - 1 Greenfield Runoff Calculations

Appendix 10 - 2 Surface Water Attenuation Calculations

Appendix 11 - 1 to 11 8 Noise

Appendix 12 - 1 Air Quality Assessment

Appendix 13 - 1 Site Gazetteer

Appendix 13 - 2 Guide for Contextualised Aesthetic Appreciation of Monuments

Appendix 13 - 3 Cultural Heritage Plates

Appendix 14 - 1 Socio Economic GVA Estimates

Appendix 15 - 1 Local Authority Baseline Data

Appendix 17 - 1 Human Health Risks Assessment

Appendix 6 - 1 Transport Assessment

Appendix 6 - 1 Transport Assessment Report

TA Figures

Appendix TA 1

Appendix TA 2

Appendices TA3 to TA10

ES Vol 3 Non Technical Summary

ES Vol 3 NTS Final

Figures

Figure 1 - Site Location

Figure 2 - Site Layout

Figure 3a -  South Elevation

Figure 3b - West Elevation

Figure 4 - Schematic Process Flow Diagram


x Staff zone login

Please enter your details below

 
 
 
Submit